Tap Creek

The Chicago & North Western Tap Creek Branch

 

The red arrows show where the two sections interconnect.

Junction Section

Track Plan

The layout consists of two sections, that interconnect at a 90 degree angle. The first section I built was they actual Tap Creek section. Here the Tap Creek branch ends, at the community that lent is name to the line.

The second section includes the start of the Tap Creek branch, i.e. its junction with the CN&W main lain.

Tap Creek Section

1 - MPL Cement    2 - The Tap creek    4 - Wayne's Implements  9 - Len's Garage      14 - Coal and sand
                  3 - Oil Dealer       5 - Depot               10 - Ash pit          15 - Diesel service
                                       6 - Residential houses  11 - Grain elevator   16 - Turntable
                                       7 - General store       12 - Feed mill        17 - Water tower
                                       8 - Parking lot         13 - Grain elevator   18 - Engine house
                                                                                     19 - Freight house

1 - Engine shed                        4 — Inter-lock tower
2 - Abandoned turn table pit
3 - Farm